- Rebuild fence (if required for access)
- Five foot fence with closure and latch (to code)
- Accurate property lines
- Homeowners Association Approval (if required)
- Sign off on pool and equipment location at time of dig (length, width, location)
- Water gunite 3 times a day until plastering
- Brush pool plaster 3 times daily (Per Pool School)
- Yard drainage
- Construction power
- Water to fill pool
- Install door alarm(s)
- Access repair (drains, cracked concrete, sprinklers, lawn, plants) in areas which equipment must travel
- Be home for pre-plaster and final inspection